top of page
423.282.4473
info@racolby.com
Central Presbyterian
Atlanta, GA
IV Manual Renovated Schantz Console with All New Interior
78 Stop Controls
22 Couplers
47 Ranks
This renovation project was undertaken by an Atlanta builder. R.A. Colby was contracted to design, construct and install the new Facade for the instrument as well as renovate and expand the existing Schantz console.
The Schantz console was modified to provide a removable back for access to the new Solid State Logic control system and wiring interface. The new interior was completed in a Eucalyptus burl with raised rosewood dividers. The interior also features custom turned rosewood knobs.
The instrument includes four digital stops by Musicom Ltd.
Project Numbers
Project Gallery
1/1
bottom of page